on 03-16-2012 6:17 PM
Hi guys,
On my SRM process the purchase order are transfered to backend system.
But, when I change one PO on EBP, system gives me a message 'supplier xxx not intended for purch. org. changing po xxxx', and don't replicate the changes on backend PO document.
If I consult one changed PO on EBP, the document have status 'saved' , and the traking detail maintain details of changes.
Can you advice me what i can do to transfer PO changes to backend system?
Best regards,
Helena
Hi Helena,
Sometimes setting the "Backend Purchasing Groups Responsible" in IMG helps to resolve this issue.
Kind Regards
Lisa
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Could you check does same cycle works in MM for same vendor.
Use Txn BBPUPDVD to update ECC vendor in SRM.
As well you can use following path for vendor synchronization:SPRO->Technical Basic Settings->Make Settings for vendor synchronization
You can also refer following SAP Notes:
SAP Note 1531626 - 'Supplier xxx not intended for purch. org. yyy'
Regards,
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Vinay,
Thanks for your answer.
I think you didn't understand my problem, because I've already relicated the PO created on EBP system to Backend system.
My problem is when I change this PO on EBP, the changes don't replicate on Backend system.
Have you ideia, how can i solve this problem.
Regards,
Helena
Hi,
With the explanation above, I assume you are using extended classic scenario.
If possible, please check whether this message is generating from EBP or ECC...perhaps this would give you better clue.
If the message is generating from EBP, pl check whether the vendor is still existing for the P.Org. using BBPM_BUT_FRG0061 table.
I think system is trying to redetermine the P.Org. during PO change. Pl whether the user ID which created the original PO and the user ID which you are using to change PO is same? Also pl check the responsibility tab of P.Grp. which u have used for the PO, in the org. structure.
Ganapathi.
User | Count |
---|---|
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.