Hi All,

The issue storage loaction is availabe in MRP 2 view,BOM Status/Lng Text tab and in MRP group .

Which has more priority on other ???

How does the system evalutes which one to be considered during the back flush ?

Thanks....!!

Regards,

Sireesha

Accepted Solutions (1)

Accepted Solutions (1)

former_member184655
Active Contributor
0 Kudos

Dear Sireesha,

The first priority will be based on the the storage location mentioned in the BOM level for a component and

the second priority will be based on the material master level.

But are you working in a discrete scenario?,then in this case these 2 settings will play a vital role.

Also check this thread, - http://scn.sap.com/thread/1844747

Regards

Mangalraj.S

Answers (3)

Answers (3)

Caetano
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hello

The issuing storage location is determined in three steps in the production order:

     o  First, the issue storage location of the material to be issued (MARC-LGPRO) is transferred to the material master from the MRP data if it is filled.

     o  The system overwrites this value with the issue storage location from the bill of material (RC29P-LGORT, STPO-LGORT) if it is filled.

     o  If the operation to which the component is assigned in production order contains a work center with supply area, the storage location is transferred from this supply area (PVBE-LGORT).

       However, this transfer is only carried out if storage location data (MARD) is maintained for this storage location for the material.

Please review note 137225 (attached). This note outlines how the storage location is issued to a production order.

BR

Caetano

sap_pp13
Active Contributor

Thanks Caetano. Your input actually clarified the existence/relevance of the field Production Supply area in the workcenter.

Clubbing all the 4 versions above and testing the output looks as below:

former_member186193
Active Contributor
0 Kudos

Hi,

Priority will be as

1. Storage Location  in BOM item

2. Production Storage location maintained in Material Master

3. Production Version

If you are miaintaining MRP Group in MMR , then goto OPPR-Plant code and MRP group -Check in Production Storage Loaction Selection -Check wether you have miantained 1 or 2

Regards,

Alok Tiwari

rupesh_brahmankar3
Active Contributor
0 Kudos

Hi,

Priority for issue storage location are as,

1. Storage Location maintained in BOM item

2. Production Storage location maintained in Material Master (MRP 2 View)

3. Production Version

Regards,

R.Brahmankar