Planned cost of material equal to zero when change to object currency!

Former Member
0 Kudos

Hi Experts,

In standard report S_ALR_87013533, when I customize report using Controlling area currency for "Plan" column.

The planned cost of material components display in screen:

But when I customize report using object currency for "Plan" column:

The planned cost of material components disappear in screen.

How can we make the planned cost of material components still appear when changing to object currency?

Please help to advise.

Thanks and best regards,

Khoa Huynh

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Is your controlling area currency and company code/object currency same??

Former Member
0 Kudos

Hi Gokul Pillai,

No. Controlling area currency and object currency are different.

Former Member
0 Kudos

Have you maintained the exchange rates for these 2 currencies? Check this in OB08. If iots not maintained, try to maintain it and then check the report.

Former Member
0 Kudos

Hi Gokul Pillai,

I already maintained the exchange rate between these 2 currencies.

Former Member
0 Kudos

In the standard report itself you have an option to conver the report to display the figures in the desired currency. Try to do that and check if the report is fetching any values. Also check for which period the exchange rates are maintained.

Former Member
0 Kudos

Please help to advise.

Thanks and best regards,

Khoa Huynh