1,按照标准我们COPY SMDV 到ZMDV。 但是在solar_project_admin创建task list的时候怎么选择用新创建的ZMDV? 在SDN上有的人表示不推荐拷贝SMDV和SMMN。那我们是不是就直接修改SMDV呢。
2, 在CRM WEBUI 中能不能直接创建project cycle和maintenance cycle. 要是可以能告诉我相应的logical links吗? 如果能够创建是不是在这里能够选择SMDV和ZMDV?
It is not recommended to use your own transaction type for SMMN/ SMDV.
If you use ZMMN instead of SMMN additional configuration is needed:
1. all the standard CRM configurations (status, actions, etc.) have to
be done for the new type
2. All ChaRM specific CRM configurations (SOCM_MAIN_001) have to be
done for the new type
3. Phase controller settings have to be adjusted for the new type
Kalven