on 08-16-2012 2:38 AM
we have a requirement to consider reservations created in PM or manual created reservations in MRP.
Could not find any way how to configure this.
Hi,
The reservations generated automatically through CBP is based upon the parameters entered in the MRP views of the material master.The MRP Type concludes how the MRP will be calculated.
Thanks & Regards,
Bijay Pradhan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Please provide more info.
e.g. about the value of the fields that you entered in your material master MRP views.
As those fields usually control how MRP works for that material.