How to consider reservations in MRP in CBP

Former Member
0 Kudos

we have a requirement to consider reservations created in PM or manual created reservations in MRP.

Could not find any way how to configure this.

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi,

The reservations generated automatically through CBP is based upon the parameters entered in the MRP views of the material master.The MRP Type concludes how the MRP will be calculated.

Thanks & Regards,

Bijay Pradhan

JL23
Active Contributor
0 Kudos

Please provide more info.

e.g. about the value of the  fields that you entered in your material master MRP views.

As those fields usually control how MRP works for that material.