on 01-08-2013 6:30 AM
Dear SAP SD group
I have a requirement where route re-determination is required in delivery
but as routes are in millions route configuration user doesn't wan't to do configuration for
all this routes .
So re-determination is only required in case of delivery , because they make STO and
sales order and then request for real route with real distance.
Any suggestions are welcome on how to do it , may be in enhancement and/or user exti
Best Regards
Jitesh
Hello Jitesh,
I have got almost same Scenario, like in my company Customer Service create order suppose on July 1st and on that date system gives confirm schedule line for July 5th, but delivery gets created on July 3rd.
Now our standard route is not possible, we want system to automatically select the route which makes sure delivery on July 5th.
Since your post is for so long, I thought you might have solution.
or you can share your solution too!
Regards,
Khawar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Khawar
Yes it is long time back, although business had withdrawn the requirement,
What i did tried was following
1) checked the userexit EXIT_SAPL0VRF_001 include ZXV00U01 which can be used for customer specific route determination.In it all the reference structure of trolz is avaliable
2) checked functionality of route determination as per function module 'SD_ROUTE_DETERMINATION' and tried to use the same in userexit by slightly modifying i.e while determination do not use weight group.
Thanks
Jitesh
Please don't post on one and half year old thread. You should have opened your own new thread separately.
Thank$
User | Count |
---|---|
99 | |
9 | |
9 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.