EHS Implementation Duration Estimation & Requirements

Former Member
0 Kudos

i need to make an estimation for this scope for a project EHS

and the skills for the needed consultant for that

Scope

Industrial Hygiene

Occupational Health Management 

+ Work Permits and integration with quality

- Safety + Dangerous goods

Phase 2 waste management + Hazards

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi Mostafa,

I can help you with the skills

SAP EHS (core)

  • Basic Data
  • IHS - Industrial Health and Safety
  • OH - Occupational Health
  • HS - Hazardous Substances
  • PS - Product Safety
  • DG - Dangerous Goods
  • WA - Waste Management
  • Report System (WWI)

SAP CA(core)

  • SRV - DMS - Document Management System
  • CA - CL Classes and Characteristics
  • CA - NO Notifications (core due QM+PM+EHS)
  • CA - ECH Engineering Change Management (Optional)
  • AM - Audit Management (Optional)

SAP HR (core)

  • PA - PA Personal Management
  • PA - OM Organizational Management
  • PA - PD Personal Development

SAP LO/PLM (core)

  • QM - Quality Management
  • MM - Material Management
  • PM - Plant Maintenance (WCM, EQM, PRT for QM Calibration tools)

Best Regards

Former Member
0 Kudos

i mainly need a one for EHS how can we cooperate

christoph_bergemann
Active Contributor
0 Kudos

Dear Mostafa

what do you mean if you ask for "hazards"? Are you referring to IHS - Industrial Health and Safety or the new SAP solution EHSM? Becuase this is a great difference.

Your questions are to "general". E.g.:

Regarding

Safety + Dangerous goods: This is related to

Basic Data

PS - Product Safety

DG - Dangerous Goods

Report System (WWI)

as mentioned.

You need to describe you project scope better. On high level regarding PS you have as well: GLM, SVT etc.

Generally you need a basic set up in "BAsic Data" to start any EH&S project. Nearly any other EHS Subprocess is based on set up as done in "Basic Data".

Furtheron: regarding time estimation: here you have the same "issue". Without a clear of the scope of the project, size of the company etc. nobody can provide suitable numbers; the necesary IT skills can be described on high level. Based on experince the set up of "Basic data" is a project with a length of around 6 months. But this is the "duration" and not the effort involved in the project.

Please check this FORUM. the same quesiotn has been asked a lot and you will a lot of infos/information etc. for "high level assesment"

C.B.


Former Member
0 Kudos

i need the duration for the core

SAP EHS (core)

  • Basic Data
  • IHS - Industrial Health and Safety
  • OH - Occupational Health
  • HS - Hazardous Substances
  • PS - Product Safety
  • DG - Dangerous Goods
  • WA - Waste Management
  • Report System (WWI)
Ralph_P
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hi Mostafa,

That's impossible to judge as we don't know how many developments your customer's requirements need, what these developments are, where and in how far they will deviate from the standard and so on.

Ralph