on 03-14-2013 7:07 AM
Hi Experts
I was getting below mentioned Errors while doing the BOM Transfer
1) In CS01 i was created the BOM
2) In CG37 if i checked in Work list it was getting Transfer error as "No specification is assigned" i was assign the specification. and executed
3) After Execution i was getting Error Like Rating and validity area is not mentioned. I was checked in assigned specification for validity are found Ok.
Can you guide me in this regard
Thank you
Balajee
Dear Balajee
as the BOM topic changed a lot in the past more information is required to answer your question.
The BOM is related
e.g. SAP EHS BOM transfer classic, SAP EHS BOM transfer taking into account "SAP product and REACH Compliance Suite" etc. and I believe there is a third option using SAP Recipe Management
Which BOM / BOS Scenario are you using?
E.g. http://help.sap.com/saphelp_ehsext30/helpdata/en/53/89a9471c244dae8307f0093cb3f717/content.htm
http://help.sap.com/saphelp_erp2004/helpdata/en/8b/b8f684ef4111d39497080009b98822/content.htm
http://www.stechno.net/sap-notes.html?view=sapnote&id=1404115
The set up of BOM transfer is different based on approach.
These are "general" hints:
You need to prepare a full set up of customizing to be successful. The BOM BOS transfer can lead e.g. to this:
You have one BOM with one "header material" and e.g. 2 item materials. Now you execute the transfer. The system can check if or if not a specifcation is present. If not a specification is created.
Now this is the "high level scenario":
Header material of BOM => Header specificaiotn in EH&S (REAL_SUB)
Two item materials => two specification are created if needed
A property is needed to stroe data: E.g.
"Standard Composition"
Two specification would be enteered in one value
assignment; now this value assignment data record
needs a "usage"
This usage need to be / can be defined in customizing etc. (refer to above link)
C.B.
PS: BOM / BOS transferred is discussed very ofthe in this FORUM. Please check other threads as well; this might help you to get the "full" picture
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Balajee,
I am not sure about your config.
you have to consider the Identifiers, validity areas, etc., to map the values from BOM to Bill of substances.
In your case, i can give you a hint to maintain the Rating and validity area in the specificitaion.
These can be maintained in the header level of the specification - under "Restrictions" Tab.
at property tree level - under each value assignment level, "Usage" tab can be used to store the values.
Maintain the values -
Rating = PUBLIC
validity area category = REGION
Validity Area = REG_WORLD
try with them and continue with your process. let us see how it works.
Regards
kamal
Dear Balajee
which scenario are we talking about?
Refering to:
3) After Execution i was getting Error Like Rating and validity area is not mentioned. I was checked in assigned specification for validity are found Ok.
These are my questions:
1.) you have linked a material to a specification => Correct? Therefore BOM BOS will not create a new spec but use that found by material / specificatiot link
2.) you would like to execute BOM BOS interface in such a way that the BOS is created using the BOM. Correct?
3.) you have done the customizing regarding BOM / BOS intreface? e.g. to create a BOS you need to specify the "property" to do so. Which one you have selected?
4.) If I remember correct : based on the BOM the BOS is created. To finilize that you need to define a "usage" in customizing. E..g. "PUBLIC / REG_WORLD" => did you prepared something?
It is important that you explaine which BOM BOS version (refer to my explanation above) you are using as customizing ettc. is different
Classic BOM BOS is explained e.g. here:
http://help.sap.com/saphelp_erp2004/helpdata/en/8b/b8f684ef4111d39497080009b98822/content.htm
Chapter: Bill of Material Transfer
C.B.
PS: BOM BOS transfer has discussed often. E.g.
http://scn.sap.com/thread/1477738
https://scn.sap.com/thread/1948911
https://scn.sap.com/thread/1661258
You can only use one BOM/BOS approach. e.g. refer to: http://www.stechno.net/sap-notes.html?view=sapnote&id=1404115
PPS: may be read cross once again:
http://help.sap.com/saphelp_470/helpdata/en/8b/3a3664314111d4b2c50050dae064a1/content.htm