on 05-29-2013 9:50 AM
I am working on SCM 7.0 SNP-
We are performing the following activities:
1. Heuristic Run
2. Deployment
3.Trasport Load Builder (TLB)
We have 2 Means of Transport specified in all T-Lanes. They are simply 2 Trucks with different capacities (15 / 21 MT), hence Transportation Dist/Time is same for both. I have maintained TLB profiles for both MOTs accordingly.
After Heuristic & Deployment Run, while making truck loads, TLB selects only the 1st MOT (21 MT).
PROBLEM: I want TLB to first make loads with 21MT Truck, and if receipts aren't enough, then only make loads with 15MT.
Have tried specifying prioroty / cost in TSP Strategy. To use TSP - it is mandatory to maintain TSP in APO (which our org isnt following).
Regards
Ankit
Hi Ankit,
I do not think that you need to create two means of transport, you need to create the TLB profile with to map this two capacity. In the TLB select the rule option 3 , and map the rule 1 0r 2 , one you assign the truck load of 15 and second one with 21.
Pl let me know this works.
BR
Thamizh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Ankit,
TLB picks up the Truck Randomly, there is no provision of Means of Transport priority in TLB .So system may pickup 21 OR 15 randomly!....configure as per Thamizh advice!
Regards,
Rajesh Patil
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Can you try exploring "Downsizing after Upsizing" of TLB profile.
Thanks.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi..
I tried changing TLB profile, but that doesn't work.
Heuristic itself assigns MOT to an order. Further steps are performed on the order taking into account the same assigned MOT.
Hence, TLB profile or any MOT setting that we use is essentially applied on the previously (by Neuristic) assigned MOT.
I am trying to find out a way to reassign MOT during forming TLB (say in Interactive planning or background).
Even if there is a way of reassigning MOT during Deployment, my problem might get solved !!
User | Count |
---|---|
9 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.