cancel
Showing results for 
Search instead for 
Did you mean: 

BPmon for DVM

Former Member
0 Kudos

Hello Experts,

I am configuring DVM in solution manager 7.0 EHP1 system i need to know is it required to configure BPmon first before configuring DVM ?

I am looking the following wiki document.

http://wiki.sdn.sap.com/wiki/display/TechOps/DVM+Cockpit+for+SAP+Solution+Manager+7.0

Could you help me to get more information on DVM configuration for Solution Manager 7.0 EHP1 SPS26.

Regards

Gajanand Gupta

Accepted Solutions (0)

Answers (3)

Answers (3)

0 Kudos

Hi,

If your looking to create BPMON alert for DVM - you can check this KPI: DVM Cockpit: Table Analysis.

Also, i found very useful information in this link: SAP Solution Manager:Data Volume Management(DVM).

Regards,

Swaroop

former_member205758
Participant
0 Kudos

HI Gupta,

No BPmon is not a Prerequisite for configuring DVM but it will complements each other along with other Functions like JSM, E2E, DCM and BPMon Optimization which follow RUN Methodology. DVM need to set on based of Historical data and Strategy made to according to the growth of your system per month (ex More then 20gb growth of ur system) and Total size of the System (Ex 500 gb). Mainly DVM works around 4 important factors :

1) Avoidance

2) Summarization

3) Deletion

4) Archive

May be i think if you can get Material of E2E300_EN_Col84_FV_A4 Doc which will have information about configuring DVM for EHp1. Might help.

Best Regards,

Shravan.

0 Kudos

Hello,

no, BPMon is no prerequisites for the DVM Cockpit. It is just that for historc reasons some of the features in DVM re-use infrastructure from BPMon. That's why you see some SAP notes related to BPMon as technical preprequisites, but no actual BPMon setup is required.

Regards

Volker

Former Member
0 Kudos

Hello Volkar,

Thanks for your reply. Can you tell me is there any seprate workcenter for DVM in Solman 7.0 EHP1 or the only area on the business process operations is there for DVM ?

Thanks & Regards

Gajanand Gupta

0 Kudos

Hello,

for SolMan 7.0 the topic of DVM is only contained in Business Process Operations as fas as I know. Only with SolMan 7.1 (SP x?) a dedicated DVM work center was introduced.

Regards

Volker