LMDB synchorizine to SLD take a long time

Former Member
0 Kudos

Hi Experts!

I know this problem is quite common in scn but I can't find the resolution for my problem.

My SolMan 7.1 has been up and running for a year and yesterday, I add a GRC instance and an enterprise portal instance to SLD.

In my understanding, job  SAP_LMDB_LDB_0000000001 is used to synchronize SLD and LMDB.

in SM37 this job has run for more that 20.000 sec and still running. in SM50 the job is still working fine ( not stall ).

I've checked LMDB setup in solman_setup and incremental is active (in SM37 also run every 10 minutes) but I was surprised that there are 4 million pending changes! I don't think adding 2 instance would make 4 million changes

I've checked the change log, this 4 million changes decrease 300 every 1 minute ( that's why SAP_LMDB_LDB_0000000001 is still running until now ).

I've checked following link but no work:

https://help.sap.com/saphelp_sm71_sp05/helpdata/en/a5/971735dd184f5c8d943c6cf423d13a/content.htm

https://websmp230.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=1555955

Does anyone has idea why my SolMan suddenly has 4 million pending changes and works really slow? Can I do something to accelerate the job so 4 million changes can be done faster? If LMDB is not synchronize with SLD, I can't fetch the data for SMSY.

Please advise,

Thank you in advance.

Best regards,

Carroll M

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Problem Solved.

Check SM12 and delete lock entries will fasten the process.

it should be normal around 8-10 changes ber sec.

Answers (1)

Answers (1)

Former Member
0 Kudos

hi,

I remembered, we implemented some sap notes to fix.

There are lots of SAP Note implementation available, have you checked

some are 1669645,1766713, 1758666, 1555955, 1681591

Thanks

Jansi