on 06-23-2013 5:36 AM
Hi gurus,
Is it ok to install the GRC 10.0 plug-in during a slow time such as a weekend or is downtime required like it is for traditional support packages?
Warm Regards,
CM
Per advice from a GRC consultant, we put the plug-in into production during a slow time while users were on and background jobs were running. This did not cause any issues. We were careful to stop the GRC system itself while the plug-in install was running so it would not try to contact the partner systems.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Clifton,
Downtime is not required for Dev & Quality systems but for Production system you may take a downtime of few hours depending on the required prerequisites.
Best Regards,
Mohammed