I’m working with a client and we are discussing SAP functionality for periodic testing (similar to stability testing in pharma). What we want to know is whether we can set up (specify) different testing periods that are flagged by SAP(yearly, quarterly, etc..) for raw material and/or finished product. If possible, we do not want to use a manual (excel based) testing program to determine when a sample needs to be pulled for testing. The client is currently on ECC 6.0 EHP3.
Greg
Dear hi,
Firstly on the indicator Check best before date/ Production date in OMJ5 plant wise.
Next in material master you have to activate the recurring 09 inspection setup in quality view.Next Add Min.Rem. Shelf life ?? & Total shelf life (in days)?? in plant data stor.1.Next add inspection interval in days in quality view.
Schedule the JOB in QA05.
Hope this will help you.
Regards,
viju22982
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
97 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.