PM/PS Integration - Maintenance Event Builder

Former Member
0 Kudos

Hi,

I have created task lists and hierarchical task lists. In the task lists I have given the PM/PS reference elements. I have created maintenance plans with notification generation and in the notification type I have added the mantenance plan tab. I have scheduled the maintenance plans,which are with the hierarchical task lists, and have got the notifications generated. I have created the revision and added the notifications to the revision and generated the work order.

But in the work order, in the additional data tab, the PM/PS references are not showing up. Why?

Regards.

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

This problem is solved. In the Define order and notification integration option 3 needs to be chosen. Thank you.