Hi,
I have a question on my MD04 in which, for some reason, SAP triggered extra PR to cover a sales order requirement which has already being fulfilled by previous PR (now converted to PO# 400003100). MD04 generated this PR after MRP run with Exception of 20 (please see following figure).
I know this has something to do with the rescheduling horizon after read through some online help but I still cannot understand the real reason behind my problem. Hope you can provide some clue.
System background setup:
A - In the material master for this material, the following field value are maintained:
B – In Purchasing Information Record for this material:
C – Scheduling setup (OMDW):
Thanks for your explanation.
Daniel
Hi,
Check material master record.
Tab MRP1 "Reorder Point"
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi where you typed
Did you in fact mean to type Planned Delivery Time? If that is the case you might want to look at the 370 days your have maintained in the PIR
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
101 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.