on 12-09-2013 10:59 AM
Dear Guru's,
One of the user did a mistake say due to wrong consumption of batches at the 1st operation confirmation, he cancelled once and 262 reversal was done.
But at the same time, he made a mistake of re-cancelled again with 262 movement type means he done the reversal entry for two times.
Actually we can go with one method by cancelling the wrong document by MBST.
Is there any other way to do it, please give me the flash lights, on it...
Regards,
Madhu.G
Hi Madhu,
There are two way to do it, one is MBST and another is MB1A post the same reversal quantity of components against the production order through 261 movement.
Regards,
R.Brahmankar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Madhu,
For cancellation, GI , GR material movement we can also use MIGO. As our expert suggest the two way, in both ways entries are same only. If we do reversal against 262 movement indirectly 261 movement will happened, same entry will happen if we do with 261 movement. Better you can cancelled the 2nd material document which is reversed again. Check it and revert back
Thanks
User | Count |
---|---|
86 | |
7 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.