11 Replies Latest reply: Jan 23, 2014 11:53 AM by Mangalraj Senthamaraikannan RSS

Sloc needs to be excluded from MRP and backflush should happen from exculed Sloc

Sireesha G
Currently Being Moderated

Hi All,


Consider there is a finished material A , under A i have a component B [ procurment type = F]


B has Slocs 0001,0002.


Now I have to exclude the sloc from 0001 from MRP,but while doing backflush the sloc 0001 needs to be considered for component consumption.


And for MRP planning I will be using sloc 0002 .


For acheving the above scenario , i have marked sloc 0001 for material B excluded from MRP via Tcode MMSC.


And I have assigned stock determination group [ consumption form sloc 0002 ] for the material B.


Now when I run the MRP , recepits for the material are getting created w.r.t to sloc 0002 , but Backflush is also considerding 0002 which is not desired .


Can some one guide me how to achieve the above scenario