cancel
Showing results for 
Search instead for 
Did you mean: 

Production version

Former Member
0 Kudos

Dear Gurus,

If i want to select only particular production version combination with, say  example if i have 5 versions but i want to use only version 4 with out manual intervention apart of using the configuration options OPL8, Material Master, how it is possible.

Any flash lights on this please....

Regards,

Madhu.G

Accepted Solutions (1)

Accepted Solutions (1)

dejoy
Active Contributor
0 Kudos

Hello Madhu.G,

Put lock flag for other version except 4 shown as below.

So now the version which is having "Not Locked" only will be called.

Regards,

Answers (1)

Answers (1)

former_member184737
Active Contributor
0 Kudos

Hi Madhu Guntuboina,

             You just change the valid to date for the remaining 4 production version with earlier date and make 4th production version date as valid ( like 31.12.9999).

Thanks

Caetano
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hello

You can develop your own logic to select a PV on the planned order using a BAdI:

Check the following document for the available BAdIs on MRP:

BAdIs for MRP

BR

Caetano