on 03-05-2014 7:54 PM
Hello everyone,
We have GRC AC 10.0 installed with ECC 6.0 backend (SAP_BASIS 731 008 SAPKB73108).
I have an error as follows:
The RFC connector has been created and tested, with the connection working, but there may still a problem.
I am trying to Sync the PFCG master data from the ECC back end system to the GRC box using the TCode: GRAC_AUTH_SYNC and I get the following error:
Unable to locate connector DE0CLNT100
PFCG authorization sync failed with errors
1. I have performed all post instalation activities
2. I have created a connector (communication with satellite system works)
3. Maintain Connectors and Connection Types -
4. Maintain Connection Settings
Note: table GRACCONNSTAT has no entries.
I have already read the disscussion posted by Paul Matthews (Apr 27, 2013), he had the same problem and it seems it was solved but the answer was not posted in the discussion. Could you help me please? Thank you in advance.
Hi David,
1) First need to check whether the connection test and authorization tests are works fine. Then we can say that no issues with RFC.
2) Try to run the Sync job through SPRO and please let us know what is the error u r getting, you can see that in job log.
3) Hope you did the settings (Maintain Connection settings) under Common Component settings -> integration frame work. And along with this, we have to add the connector under Access control -> Maintain Connection settings.
Check this settings once.
All the best.
Thanks,
Sankar.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear David,
Below thread will help you.
http://scn.sap.com/thread/3350191
Thanks & Regards,
V Srinivasan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.