No costs in CK24 from CK74N. Additive cost not updated.

former_member615125
Participant
0 Kudos

Guys,

I need a hand on this.

I can’t update combined price in CK24.

I did CK11N – got $100

I planned CK74N – got $20

I did CK11 again – got $120

But when I go to CK24 I keep seeing only $100.

I think costing variant properly prepared and OKTZ also since during the second CK11N I see the good value with good cost component assignment.

I have to costing variants with 2 different costing types. One updates the standard price another price other than standard price. Neither works.

What am I missing?

Many thanks in advance

G

Accepted Solutions (1)

Accepted Solutions (1)

ajaycwa1981
Active Contributor
0 Kudos

Hi Gergej

I can think of only one reason.

The cost component that manages this additive cost is not relevant for inventory valuation in OKTZ

Can you check this if it is marked as NOT RELEVANT for inventory valuation

Br. Ajay M

former_member615125
Participant
0 Kudos

That was the thing, thanks Ajay.

Another stuff what bothers me that the second costing variant which is practically identical with the first one doesn't update. The difference between the two is that the first one has price update "Standard price", the second "Commercial price".

I tried the second one with also "Prices other than standard price".

I CK24 I clicked the "Other prices" icon, entered relevant data and checked "Commercial price 1" but there was no update at all. 0 materials were updated succesfully.

THX

G

ajaycwa1981
Active Contributor
0 Kudos

Hi Gergej

Check if the 2nd Costing Variant allows to Save the Cost estimate, Itemization, etc

If the cost is saved in CK11N, it has to get updated in CK24

Br, Ajay M

former_member615125
Participant
0 Kudos

Thanks for quick response.

Unfortunately, this variant has the same settings:

What I do in CK24 is:

Filling the Company code, Plant, Material, then

klick "other prices", then

Filling the Costing variant, Costing date, Costing version, then

Check the "Commercial Price 1", then

F8

And got nothing.

THX

G

ajaycwa1981
Active Contributor
0 Kudos

I am lost!!

Can only think of the reason the Costing dates in CK11N and what you are mentioning in CK24 is not same

What does your costing type says for this new costing variant with regards to the DATE?

Br, Ajay M

former_member615125
Participant
0 Kudos

Costing type

CK11N

CK24

ajaycwa1981
Active Contributor
0 Kudos

Hi Gergej

Seems OK to me...

For similar requirement, my costing type used to have "With Date", instead of "With Start of Period"..

I am not sure if that's the reason.  Can you give it a try??

Br. Ajay M

former_member615125
Participant
0 Kudos

No, I'm really sorry. Don't know what's happening.

former_member615125
Participant
0 Kudos

Since my material had no BoM, the missing setting in CK24 was this:

Answers (3)

Answers (3)

rajneesh_saxena
Active Contributor
0 Kudos

Dear Gergej

Just a wild guess:

After CK74N when you did the CK11N. did you save that.

Also check the Cost component in which this additive cost is to be added that it covers fixed and variable both in 'Cost share', because if you give price in CK74N in the Price-fixed column than it is treated as the fixed cost.

you are very right that If BOSS is there then we can only give wild guesses. All concrete points he already mentions in his replies. But no harm in trying, Right Ajay Sir?

Regards

Rajneesh Saxena

ajaycwa1981
Active Contributor
0 Kudos

Another guess. Does this scenario pertain to stock transfer??? If yes, check if additive costs for stock transfer is allowed in the costing variant

Br. Ajay M

former_member182339
Active Contributor
0 Kudos

Adding to Ajay's reply, Are you sure the addictive cost saved ?

You have to hit the save button twice in CK74n before it saves the addictive cost.

Thanks

Hrusikesh

ajaycwa1981
Active Contributor
0 Kudos

Hi Hrushi

If the cost added is appearing in ck11n, that means it was saved in ck74n

Br. Ajay M

former_member182339
Active Contributor
0 Kudos

Yes right i missed that point its already updating the ck11n ! I try restrict myself to answer when you already answered a question.

anyway Thanks