on 03-26-2014 5:20 PM
Hello,
I have BusinessObjects 1.4 SP06 with Excel 2013 and I am trying to include a planning sequence (or function) in the workbook.
After including the planning sequence in the components tab, the properties are not displayed and if I try to select it again the system issues the following error message:
Control does not support transparent background colors
The image shows the error message and the components tab with no properties for the planning sequence.
The detailed error, from the log file, is the following:
com.sap.ip.bi.pioneer.core.main.CrSession.ProcessUnhandledException() ()
- Critical: General .NET Exception:
Control does not support transparent background colors.
at System.Windows.Forms.Control.set_BackColor(Color value)
at com.sap.ip.bi.pioneer.excel.controls.structurepane.EaPlanObjectPropertiesControl.RefreshAccordingToTheme()
at com.sap.ip.bi.pioneer.excel.controls.structurepane.EaPlanObjectPropertiesControl.Init()
at com.sap.ip.bi.pioneer.excel.controls.structurepane.EaPlanObjectPropertiesControl..ctor()
at com.sap.ip.bi.pioneer.excel.controls.structurepane.EaStructurePane.ControlCommandProcessor_ContextChanged(Object iSender, CoContextChangedEventArgs iEventArgs)
at com.sap.ip.bi.pioneer.common.commands.CoCommandProcessor.OnContextChanged(CoCommandContext iCommandContext)
at com.sap.ip.bi.pioneer.common.commands.CoCommandProcessor.CalculateContext(CoCommandContext iContext)
at com.sap.ip.bi.pioneer.core.commands.CrCommandProcessor.CalculateContext(List`1 iViews)
at com.sap.ip.bi.pioneer.excel.controls.structurepane.EaStructureTreeDpControl.<OnAfterSelect>b__0()
at com.sap.ip.bi.pioneer.controls.main.CnSession.DoAmodalUserAction(UserActionDelegate iDelegate, CoUseWaitCursorEnum iWaitCursor)
I have re-installed BOA and installed the latest SP version, but without luck. Has anyone encountered this error? Any ideas on how to solve it?
Thanks in advance,
Luis
Hi,
This should solve with below note
Please follow
http://service.sap.com/sap/support/notes/2048482
Best Regards,
Subhash
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Luis,
We are using the latest available version 1.4.8 and we have the same issue.
I opened incident to SAP and the provided response is that the correction will be delivered with Analysis for Office 1.4 SP9 release.
Kind regards,
Boris
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Luis,
did you find a solution for this issue? I am facing the same problem. Under Office 2007 my workbook with included Planning sequences did run without any issue, since i have my new workstation with new Office 2013 32bit i get the same error as you get.
Hope you will have some input for me.
Best regards,
Benjamin
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Luis,
Are you using Excel 32 or 64 bits?
Regards,
Diego.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
80 | |
9 | |
9 | |
7 | |
7 | |
6 | |
6 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.