Accrual/ Deferral does not look at actual postings

Former Member
0 Kudos


Hello

My condition frequency is quarterly in advance. I have not run RERAPP for the quarter. However when we run RERAALCN (Accrual/ Deferral run), system still consider the deferral for this planned posting.

We do not want this functionality. How to let system read only posted data?

Thanks

RE Learner

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Dear Learner

Go to RECACUST--> Basic Settings--> Co Code Basic Settings

Double click on your company code

Check (Select) option : Accr.Dep.on PrdPstng

System will work the way you desired

Happy Learning

Rakesh

Former Member
0 Kudos

I love this forum.

Thanks Mr Rakesh. It worked.