on 04-07-2014 1:31 PM
Dear All
Requirement related to free goods functionality
For instance if a customer orders Material A - 10 Ea ( Line Item# 10) he gets 1 Ea has free item ( Line item# 20) which is populated as additional line item in the SO .
This additional line is passed to delivery and eventually results in 2 EWM tasks for physically same Material A -11 Ea to be picked from assuming same bin.
ECC-WM functionality supports creation of single TO for multiple delivery lines having the same material.
Is there any way to achieve the same in EWM.
regards
Saravana
...does anybody know in the meantime whether there is something in EWM 9.2 standard to solve the requirement described in the initial request here?
We have the same situation -
delivery with multiple items having the same material for which we would like to get one shared warehouse task.
Thanks
Hendrik
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Duraiajan,
Same requirement ..we have line item 10 having product A with 1.5 pallet picking req and line item 20 having another 1.5 pallet picking req so we want to pick 3 full pallet from ASRS rather than picking 2 full pallet from ASRS and .5 and .5 from loose pick.....did u find the solution to this prob in standard or this requirement needs a custom code ???
Thank you in advance !!
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
In ECC, It is possible when you use 2-Step Picking? Are you expecting the same in EWM?
Regards.
Sathish
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Sathish
I earlier mentioned about the WM functionality of TO creation for multiple deliveries and not 2 step Picking..
In the outbound delivery monitor-> for Picking .. If you go to subsequent functions and then select group->create with WM reference
A pop-up appears with a Small check box ( TO for multiple deliveries).
regards
Saravana
Hi,
"ECC-WM functionality supports creation of single TO for multiple delivery lines having the same material."
I would really be surprised if this is any standard functionality? So I also don't expect this in EWM...
brgds
Juergen
To detail what I mean and because you specified this in another mail: a single TO is possible, but not a single TO item. And the same is for EWM. You might get a single WO, but not a single WT.
Message was edited by: Juergen Pitz
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Duraiajan
I hope this is also happening in EWM.
WO is the document in which you have all WT. If you have 2 WT then it will be in one WO which is equal to TO in ECC.
As WO is assigned to user/resource.
Regards
Suraj
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
9 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.