cancel
Showing results for 
Search instead for 
Did you mean: 

Creating Manual Inspection lot for Partially Confirmed Production Order

Former Member
0 Kudos

Hi All,

I Have a production order with status PCNF, I wanna create an inspection lot type 03 but get this error:

Order Status:

Any Idea how to create Inspection lot without changing the order's status ?

Or even if it is necessary to change the status, what is the procedure?

Accepted Solutions (0)

Answers (2)

Answers (2)

former_member184666
Active Contributor
0 Kudos

Hi Mehdi,

Once order status is PCNF you cannot create lot with inspection type as 03. You need to reverse all the confirmations/Goods issue and activate 03 inspection type in material master, maintain MIC related data in routing and do Read Master data. Then system will create inspection lot.

For 03 inspection type manually inspection lot cannot be created. Once order is released inspection lot will be automatically created by system.

Thanks & Regards,

Ramagiri

Former Member
0 Kudos

Dear Mehdi,

Order is already partially confirm. So, you can not create inspection lot 03 (Inprocess) for the same.

You have to cancel or reverse the partially confirmation and try to create.

Sandip