on 04-14-2014 10:54 AM
I am trying to prepare the parallel processing scenario in MDG 7.0 for Material configured MAT01, MAT02, MAT06,MAT0A,MAT0B scenarios as it
is successfully.
Material Change Request Scenario MAT02 is working as expected.
I just copied MAT02 change request and created parallel change request types PCMAT01, PCMAT02 and PCMAT03.
Screen shots of PCMAT01
PCMAT02 Screenshots
PCMAT03 Screenshot
While Executing Change Material, I am getting the following popup to select change request. But, When I choose the above 3 change requests,
Workflow is getting User Agent Error. Do we need to have any special BRF+ catalogs for these change requests as well? Or we use same MAT02 BRF+ decision table?
For Parallel change request scenario, apart from creating Parallel CR type, We need to take care of any BRF+ catalogs (new decision table
set) ,interlocking logic or any other special requirements?
Hello Abdullah,
I assume we can download BRF+ decision tables in Excel and import.But,How to create new BRF+ application / catalog for parallel change request ? Please explain in detail.
Thanks in advance. I apprciate your response.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello,
Although the workflow is similar, each CR has its own BRF+ application in the rule-based workflow template. To make your life easier, download the 3 working BRF+ decision tables into MS Excel. And then, upload them into the new BRF+ applications for the new CR types.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
73 | |
26 | |
10 | |
9 | |
7 | |
6 | |
4 | |
4 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.