Hello,
I am experimenting with Material Ledger Actual Costing and am using the IDES elevator example. I have posted PO's, goods issues, goods receipts, and have gone through several production orders for the finished good. When I go through the Closing Cockpit to do Actual Costing, I'm able to select the materials, sequence them, and do single-level price determination. But, when I do multi-level price determination, no records are found.
The only thing I can think of is something I saw during selection. There was a filter table indication of 6 entries being stored. Looking online it appears this is table CKMLMV0LLF, but I'm not sure about that and I couldn't find anything online about this.
Please let me know if you have any suggestions. Thanks!
Tony
Hi Tony,
1. have you activated actual costing in the configuration?
2. Do your materials have price determination 3?
best regards, Udo
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello,
I found that my issue was not configuration, but data. Reviewing the SAP Press book, I found that I did not have sufficient consumption to require multilevel variance. All the variance was absorbed at the raw material level. When I increased consumption by executing a higher quantity Production order, multi-level price determination worked fine. Udo, thanks for your help.
Cheers,
Tony