cancel
Showing results for 
Search instead for 
Did you mean: 

Absence quota validation

Former Member
0 Kudos

Dear experts,

I have a scenario, like where i need to do absence quota validation for 2 employee sub groups.

It must be one year, but its being configured already as 2 years.

I need to change the deduction period. Also provide the steps to configure validity period.

Regards

Bala

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi Balaji,

check the table V_T559L

Validity/deduction interval

Validity period for default values

Former Member
0 Kudos

Hi Praneeth,

I need to change the deduction period. May i know where it is in V_T559L

Regards

Bala

Former Member
0 Kudos

In that table validity / deduction interval

of go to table V_T559D and select your ESG & PSG time quotas with specific Absence quota and check Deduction interval - deduction from and deduction to