cancel
Showing results for 
Search instead for 
Did you mean: 

Activate Cost center in VL01N

Former Member
0 Kudos

Dear SD experts,

I want to activate the Cost center field in VL01N under the Goods Movement tab.

Pls advice.

Regards

Accepted Solutions (1)

Accepted Solutions (1)

Lakshmipathi
Active Contributor
0 Kudos

Can you explain the Business process which warrants you to have such a requirement?  This may be achievable via standard configuration but I dont think, it is recommended to do so.

G. Lakshmipathi

Former Member
0 Kudos

Hi,

The COGS was getting captured in the wrong Profit center of the wrong plant and with some investigation found that it was defaulted in OKB9. I had removed the defaulted cost center. Then at the time of posting in VL01N I got the error 'Account xx is not assigned to a cost center'. Hence I was looking for an option to enter the Cost center in VL01N to see if I could overcome this issue.

I have found the solution to my problem. I was able to default the Profit Centers with their corresponding cost centers in OKB9 itself. After posting, I found that COGS is getting posted correctly.

Best Regards

Answers (1)

Answers (1)

venu_ch8
Active Contributor
0 Kudos

This message was moderated.