on 04-22-2014 8:03 AM
Dear GRC,
I had problem with Risk analysis Report in GRC Access Request form
When i run the Risk analysis report on Action Level , Permission Level , Critical Action Level and Critical Permission Level then report showing as "No Violations" but if i run the Risk analysis report only on Critical Action Level and Critical Permission Level then report showing too many Violations.
I maintained Action Level , Permission Level , Critical Action Level and Critical Permission Level as default risk analysis type in SPRO Configuration Parameters settings.
i am not understanding why system behaves like this. Could you please help me on this.
System Details : GRC AC 10.0 , SP-12
Thanks a lot for swift response.
Best Regards,
RK
Hi GRC Team,
Please help me on this. I am waiting for your replay.
Regards,
KR
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.