cancel
Showing results for 
Search instead for 
Did you mean: 

Modification Rule(08) allows Full Testing for Quality Batch

Former Member
0 Kudos

Hi Friends

I have case wherein the system allows Full testing in QE51N for material which has been maintained Modification Rule-08 in order

to do reduced testing.

The Modification Rule included in the inspection plan  does not work as expected while Processing in QE51N transaction.

Please note that we are Pharma industry.

Thank you

Accepted Solutions (0)

Answers (1)

Answers (1)

lakshmi_prasad7
Contributor
0 Kudos

Could you explain what is the  Modification Rule - 08 is it dynamic modification rule or sampling scheme

Former Member
0 Kudos

The Modification Rule is L08 and this will allow testing one a year for MIC assigned.

former_member221025
Active Contributor
0 Kudos

Hello Siddharth,

Please be more elaborative about L08 rule and issue you are facing.

What are the stages created? What is dynamic modification level in Inspection Plan?

May be screenshots will help.

Amol.