I entered a sender cost center, an activity type and a receiver cost center in KB21N and entered the quantity as 1. SAP makes the price show up as 1.11 CAD.

I maintained the price for this activity type and cost center as 1, why is it picking up 1.11 rather than 1 in KB21N?

My cost center's currency is CAD, there should be no exchange rate type that is affecting this right?

I checked CAD-USD in table tcurr just to make sure that no exchange rate was affecting this and I didn't find any exchange rate that would make it 1.11.


Please help

Accepted Solutions (0)

Answers (2)

Answers (2)

rajneesh_saxena
Active Contributor
0 Kudos

hi

Have you done any actual activity price calculation for the CC before doing KB21N. If yes that may be the actual activity price.

Regards

Rajneesh

former_member182339
Active Contributor
0 Kudos

Check OKEQN currency setting what Exchange rate type you maintained there.