Classic Scenario Possibility

Former Member
0 Kudos

Hi Friends,

I am a first times for Classic Scenario implementation.

Can the below scenario is a Possibility in SRM

1. SC creation

2. SOCO

3. RFX and Vendor Response

4. Central contract in SRM and distributed to MM

5. Release orders (PO) in MM with ref to Central COntract

I have few Questions:

1. What is the BSA attribute will be there in Classic

2. Can we create initiate sourcing from SC in CLassic or every time we create SC, it will create PR in ECC.

3. Can central contract be created locally in SRM and distributed in ECC (similar to Extended Classic)

Appreciate any help in this regard

IS

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

I am bit confused on the Scenario to Opt for (Between Classic and Ex Classic).

Follwoing Process are within Scope

Self Service Procurement

External PR for Sourcing in SRM (CPPR/Plan Driven)

Complete Sourcing (Startegic Sourcing/Bidding/Auction/)

Contract Management (Central Contract)

ROS

SuS (Supplier Collaboration)MM-SuS

SRM-MDM

Based on the Above, what will be the appropriate Scenario to go for.

Client is not specific about the System (SRM or ECC) for PO creation.

Regards

IS

wendy_xu
Active Participant
0 Kudos

Hi IS,

Then I think Classic Scenario would be a better option.

Using Extended Classic scenario will have some limitations with SUS. See note 543544, 700350.

All the processes you listed should be running well in a Cassic Scenario landscape.

Regards,
Wendy

Former Member
0 Kudos

Thanks,

Due to that Limitation only I was confused a bit.

I think Classic will be a better option.

Thanks

IS

Former Member
0 Kudos

Thanks Wendy!!

Former Member
0 Kudos

Thanks Ivy

ivy_li
Active Contributor
0 Kudos

1, For classic scenario, PO has to be created in MM side directly. Except for this, ther other scenario mentioned above area supported.

2, BSA attribute is used to define 'document type in R/3 system'. Here the value defined will be used for ECC documents which is created from SRM side. For example, if you create ECC PO from sourcing, the value defined here will be used for ECC PO type.

3, Can we create initiate sourcing from SC in CLassic? Yes.

4, Can central contract be created locally in SRM and distributed in ECC? Yes

Regards,

Ivy

Former Member
0 Kudos

Thanks IVY for the reply.

I am bit confused on the Scenario to Opt for (Between Classic and Ex Classic).

Follwoing Process are within Scope

Self Service Procurement

External PR for Sourcing in SRM (CPPR/Plan Driven)

Complete Sourcing (Startegic Sourcing/Bidding/Auction/)

Contract Management (Central Contract)

ROS

SuS (Supplier Collaboration)MM-SuS

SRM-MDM

Based on the Above, what will be the appropriate Scenario to go for.

Client is not specific about the System (SRM or ECC) for PO creation.

Regards

IS

ivy_li
Active Contributor
0 Kudos

Hi,

Agree with Wendy who is expert in SUS side

Regards,

Ivy

Former Member
0 Kudos

Ivy,

Do you know how to realize the scenario:

For classic scenario

Create SC in SRM, automatically create a reference PR in ecc, then PO ,....

Thanks

Regards,

Hayashi.

ivy_li
Active Contributor
0 Kudos

Hi Hayashi,

some customizing have to be done: such as sourcing should not be active for such product category, and in 'Define Objects in Backend System (Purch. Reqs, Reservations, Purch. Orders)', you should also define the backend object well. Meanwhile number range, etc should be defined well.

Regards,

Ivy

Former Member
0 Kudos

Ivy

Thanks for your reply. I get it.

one question, I should disable SOCO in this scenario, is it?

Regards,

Hayashi.

Former Member
0 Kudos

Hi All,

One more thing, the External PR Sourcing( From ECC MRP or PM) is a std in Ex classic.

Will this be a feasibility in Classic. Do we have to do changes in BADI for Backend System Identification??

IS

ivy_li
Active Contributor
0 Kudos

Hi,

There is no way to disable sourcing, but you can set different sourcing mode for different product category in customizing 'Define Sourcing for Product Categories'.

Regards,

Ivy

ivy_li
Active Contributor
0 Kudos

Hi,

PR can be transfered in both classic and extended classic scenario.

For limitation of PR transfer(using report), please refer to the following document:

Regards,

Ivy

ivy_li
Active Contributor
0 Kudos

Hi Hayashi,

you can also refer to the following doc:

It talks about reservation from SC which is similar to PR from SC.

Regards,

Ivy

Former Member
0 Kudos

Ivy

Thanks very much.

I admire your speed to find out the reference document.

Regards,

Hayashi.

Former Member
0 Kudos

Hi Ivy,

In the SOCO, after creating PO draft there is no No transaction types available in SAP SRM.

I believe it is as per the KBA:1580116.

Howe the PO will be created and from where it will take the Tr Type.I have maintained the Tr type in both ECC and SRM with no range and making it External in ECC.

I came across the note 1323983. Will this help

Regards

IS

ivy_li
Active Contributor
0 Kudos

Hi,

note 1323989 is talking about creating PO from RFx, not sourcing. So it is not applicable for your case.

KBA note 1580116 is created by SOCO expert and she identified that what you are experiencing is standard behavior.

You have to define ECC PO type in SRM system too, and this type can also be set for attribute 'BSA' for the purchaser in ppoma_bbp. Then this type will be defaulted to PO type while creating ECC PO from sourcing.

Regards,

Ivy

Former Member
0 Kudos

Yes Ivy,

I did that and PO is created.

I am looking for the option to fill the requirement of multiple Tr Type.

For Example if my PO Tr type/Doc Type is based on Plants and user can procure for two plants.

So i'll assign the tr type in BSA (Multiple Tr Type).

Now How system will pick the correct one.

Is it some customization required here

Regards

IS

ivy_li
Active Contributor
0 Kudos

Hi

Your requirement can't be realized with standard customizing.

I am afraid that you have to do modification in order to realize this.

Regards,

Ivy

Former Member
0 Kudos

I am not sure as I have to test this in system but i found this some where which needs to be checked.

Section 3: Default Transaction Types

If there are multiple transaction types determined, then the default entry in the transaction type dropdown box is set to 'space'. If there is only one entry found for the user then this will be displayed as the default entry in the dropdown box. Here is the code section where it happens: /SAPSRM/CL_CH_WD_DOM_SOCO_GAF3, /SAPSRM/IF_CLL_MAPPER~REFRESH:

ivy_li
Active Contributor
0 Kudos

Hi,

I think you fond the right place where this is determined. This is hard-coded here.

If you expect to have lists of ECC PO types, I am afraid that you have to modify the standard coding.

Regards,

Ivy

Former Member
0 Kudos

Thanks Ivy,

I'll check the same on options and feasibility.

Thanks Alot.

IS

Former Member
0 Kudos

Hi Ivy,

I would like your view on the option to opt between CPPR or Plan Driven for the External Procurement.

I am planning to have thr PR directly in the SOCO and it will be manual to transfer. Not all PR from MRP is coming to SRM.

PR for Plant Maint. and service PR only

Will you be able to provide some insights between the two

Regards

IS

ivy_li
Active Contributor
0 Kudos

Hi IS,

For PR transfer, we only have report transfer or SOA transfer in PDP.

CPPR is another functionality which doesn't belong to PR transfer.

No matter you transfer PR via report or SOA, it can be transferred to SRM to generate SC.

If you want this SC to go to sourcing, you should configure customizing well in 'Define Sourcing for Product Categories', or use relevant BADI to set source_rel_ind indicator.

Regards,

Ivy

Former Member
0 Kudos

Hi Ivy,

Thanks for the reply.

My understanding  is that CPPR:Collaborative Processing of Purchase Requisition (CPPR) is also From EHP4/ERP 6.0 requirements can be transferred using Collective Processing of Purchase Requisition (CPPR) .

Where as the PDP is the traditional way.

CPPR we need SOA where as PDP can be through RFC.

Do correct me here if i am wrong. I need to be clear in my understading please.

IS

ivy_li
Active Contributor
0 Kudos

Hi IS,

Yes, CPPR also needs SOA configured.
However CPPR is not used for PR transfer. Once it is active, you can send PR to CPPR and then create RFx/contract/PO/auction according to your requirement.

Best regards,

Ivy

Former Member
0 Kudos

Thanks Ivy

Many Thanks for your Replies.

IS

Former Member
0 Kudos

Hi Ivy,

I require a help if you could to know if we can set up a PO approval Process in Classic Scenario.

I understand that , PO is not visible in SRM (PO not in BBP_PD) for classic scenario ,so not sure if the approval process can be set up and if the approver can see the PO and change it during approval.

Regards

IS