on 04-23-2014 12:01 PM
Hi All,
While I am creating GR against process order with mvt. type 531(Receipt By Product) there are two inspection lots creating automatically with same batch , material document , process order with same quantity for the selected material and plant. While I see in MB51 there it shows only one movement has taken please with mvt 531 for selected material , plant and batch.
How the duplicate inspection lot is creating automatically for by-product? Please do let me know if you need more information about the process.
Thanks in advance!
With Regard,
NKB
Hi NKB,
Which inspection types are assigned for the above said By-Product Material master?
Regards,
Kumar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
I believe this might have happenned because of the way the PO was setup. If they created two line items in the PO for the same material, (i.e.two tractor-trailers of a bulk product), and you had the control inspetion lot to be for each document item then you would get two lots, even if the batch numbers were the same. But if the GR for both was done at the same time, (not unusal as sometimes one person collects all the weigh tickets for one day and enteres in all the GR's at one time), then you would only have one material document.
Changing the control inspection lot setting would impact that.
Craig
User | Count |
---|---|
88 | |
7 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.