MRP - Is it possible not to include stock that has already been used for planning in previous MRP Run.

former_member746980
Participant
0 Kudos

Hi all,

There's a business scenario where one wants to have control that if existing stock has been used for planning same shall not be available in next MRP run.

Existing Stock: Fabric - 1000m

Sales Order - 1567: required Fabric Qty: 600

MRP Run, Existing Stock is included : No Purchase Order is recommended

GRPO is created for fabric for 300mtr

second sales order is created where Fabric required is 800mtr

On MRP Run system shall display Purchase order only for 100 mtrs.

To summarize, is this possible to exclude the existing stock that has been consumed in previous MRP Run which has to be yet executed.

Thanks

Sonil

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi Sonil,

MRP is not a budget, it may only be calculated based on the inventory and orders. It is not possible to exclude the previous MRP run.

Thanks,

Gordon

former_member746980
Participant
0 Kudos

Thanks Gordon,

there was a requirement from one of our client, so just looking out for the same if can be achieved by any means to avoid customization.

nyways thanx all.

Sonil

kothandaraman_nagarajan
Active Contributor
0 Kudos

Hi,

Not possible to exclude. MRP will consider initial stock for MRP calculation.

Thanks & Regards,

Nagarajan

Former Member
0 Kudos

Hi,

You can do it by exclude the first sales order no - 1567 in the second MRP run.

This facility is in after 8.82 version only.

Regards

Sridharan

former_member746980
Participant
0 Kudos

Hi,

I am running MRP only for the required sales order using restricted sales order..

Is there any additional feature wherein I can exclude the sales order no 1567, basically the exclude the stock consumption made in previous MRP run?

Regards

Sonil

Former Member
0 Kudos

Hi,

Pls change the delivery date of the first sales order no1567 and try.