on 04-29-2014 11:52 AM
Hi Experts,
I am in process of SAP portal upgrade.
Source: EP NW 7.0 SPS26
Target: NW 7.3 EHP1 Upgrade
OS is windows 2003 with database as MSSQL 2005.
Database to be upgraded to MSSQL 2008 with OS windows 2008.
Right now I am doing this on Sandbox.
I am at preprocessing phase.
Deploy_api.0.log
=======================================================================================================
Apr 24, 2014 7:02:56 PM Info: com.sap.ASJ.dpl_api.001023 Deployment of [name: 'com.sap.netweaver.coll.appl.room.rfcadapter', vendor: 'sap.com' (sda)] finished.
Apr 24, 2014 7:03:11 PM Info: com.sap.ASJ.dpl_api.001023 Deployment of [name: 'com.sap.nw.pcc.ui', vendor: 'sap.com' (sda)] finished.
======================================================================================================
SUM showing Component "'com.sap.nw.pcc.ui'" is deploying, 3 days has passed at this step.
I am monitoring database too. Datafile and logs files are getting utilized at very slow speed(there is enough free space in DB)
Do anyone have any idea if this is normal or some issue is there.
Regards
Shontu
Hi Shontu,
3 days is not a normal behaviour, did you raised message with SAP. Did you stopped and restarted the upgrade.
What about CPU and RAM which process is utilizing CPU and RAM. what does the upgrade log says.
Regards,
Deepanshu Sharma
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Deepanshu,
Yes I have opened a message with SAP today, waiting for their reply.
CPU - 3.0 Ghz (2 Processor)
RAM - 16 GB
As per deploy_api.0 log in C:\SUM\SUM\sdt\log\SWITCH below are the last update.
=======================================================================================================
Apr 24, 2014 7:02:56 PM Info: com.sap.ASJ.dpl_api.001023 Deployment of [name: 'com.sap.netweaver.coll.appl.room.rfcadapter', vendor: 'sap.com' (sda)] finished.
Apr 24, 2014 7:03:11 PM Info: com.sap.ASJ.dpl_api.001023 Deployment of [name: 'com.sap.nw.pcc.ui', vendor: 'sap.com' (sda)] finished.
======================================================================================================
SUM showing Component "'com.sap.nw.pcc.ui'" is deploying, its more then
3 days. No logs are getting updated in Folder SUM\SUM\sdt\log\SWITCH
I am
monitoring database too. Datafile and logs files are getting
utilized at very
slow speed(there is enough free space in DB).
Regards
Shontu
Hi Shontu,
Have you got reply from SAP. There is something wrong that's why it is taking so much of time.. No doubt it should not as 3 days is a long period.
If this is unix then can you please check system messages in /var/adm/messages and see what going at system level.
Regards,
Deepanshu Sharma
User | Count |
---|---|
80 | |
9 | |
9 | |
7 | |
7 | |
6 | |
6 | |
6 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.