cancel
Showing results for 
Search instead for 
Did you mean: 

Alert Scheduler not working

Former Member
0 Kudos

    Hi Experts,

I am using SPM 3.0 SP3. I have done all the standard Configurations per the published SPM Guide.

I am not able to figure out why the Scheduler Administration is not working. The Status always is STOPPED.

Please help.

Thanks,

AG

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi John,

Thank your for your reply. None of the notes could help to resolve my issue.

In the Scheduler Administration option, the START/STOP buttons are disabled. The Scheduler status is STOPPED. I can change the execution date and time and save the changes. Nothing really happens though.

Is there any services that i need to check? Any job that should be monitored?

Thanks in advance.

Abhishek

former_member257798
Active Participant
0 Kudos

Hi Abhishek,

The following SAP KBAs might be of assistance to you.

1839757 - Scheduler not working in SPM UI

1969541 - SBC BUI NW Adapter 3.0 SP12 Patch 1

1741764 - SPM: How do you know which reports have been scheduled and when they will run?

1745904 - Spend: How to check Alert Notifications list in backend

    

Kind Regards,

John Harris

Senior Support Engineer, SAP Active Global Support,

SAP America, Inc., 1001Summit Blvd, #2100, Atlanta, GA 30319, USA