Hi All,
I am facing a problem in operation completion in ME. In my routing I have multiple operations where one operation contains list of BOM components (160+ Components). For all the components the backflash is checked in ECC and same is downloaded to SAPME. In SAP ME when I am completing the operation, it is taking 8 Sec time but I want to reduce the time as normal operation takes. When I am completing other operations, those are taking just 1 Sec.
As I understand system is checking all the components backflash for that particular operation in SAP ME before completion of that particular operation. Is there any way that I can stop the system to check the component backflash for all components.
Thanks in Advance
Chandan
Hi Chandan,
By disabling hooks etc., try to narrow down if the performance is in the Start/Complete itself, any activity hooks, such as AUTOASSY_COMPONENT or CT520 or the collaboration event. If it is a Production Order ME version 6.1, check your parameter setting per Note 1949193 - Restrict components in confirmations based on 'Backflush in ERP' flag
Regards,
Andrew.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
98 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.