cancel
Showing results for 
Search instead for 
Did you mean: 

Scheduling a job to run procedure in 68

patrickbachmann
Active Contributor
0 Kudos

Hi folks,

I need to schedule a job that will kick off my hana procedure every 1/2 hour.  I have done this successfully on 72 however I need this to work on our 68 server at the moment as it will be a while before we get that server upgraded.  I remember reading about a way to do this at the system level by scheduling a cron job but I can't seem to find where I've previously read this.  Does anybody have any information on how to do this or can you point me in the right direction?  Documentation on SAP website is all up to date now and I can't find the old 68 documentation.

Many thanks!!

-Patrick

Accepted Solutions (1)

Accepted Solutions (1)

former_member182302
Active Contributor
0 Kudos

Hi Patrick,

Kept some of the links in this blog

Check it out .

Regards,

Krishna Tangudu

patrickbachmann
Active Contributor
0 Kudos

Thanks!

Answers (0)