on 07-10-2014 1:40 PM
Hi all,
we have in one of our environments the issue, that three of four cubes switch at the same time to:
"Real-Time Data Target can be loaded with data, Planning not allowed".
The switch happens unregularly. There are no BW process chains, data loadings or other processes for those cubes.
Two of three cubes with this strange behavior, have only manual data input via Excel sheets distribued by BPFs.
The third Cube is the standard "RATES" cube, no data input happens for this at all.
Does somebody has an idea what could cause this switch in the loading behavior or is there a log, which is recongizing this switch.
BW 730 Level 008
BPC 10.0 Patch 11
EPM Client versions SP14 Patch 3 & SP16 Patch 1
Thanks
Patrick
Hi Patrick,
Do you have any modified lite optimise process chains?
Andy
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
6 | |
5 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.