Delta load for 0MATERIAL_ATTR

0 Kudos

Hello,

  My delta for 0material_attr does not bring any of the change or added materials into BW system whereas the same has been tested for 0customer_attr and it is working fine. When i see the delta process it is NEWE for material master but E for customer master. Need advice on how can i make the material master to work for any change/additions. Iam doing full load for the time being but cannot afford to do in future.

Any advice is appreciated.

Thanks

Haradev

Accepted Solutions (0)

Answers (1)

Answers (1)

RamanKorrapati
Active Contributor
0 Kudos


Hi,

its standard data source. So no need to change anything.As my guess existing delta may be corrupted.

Again do the reinit without data transfer and set delta pointer at info pack level.

Before doing reinit, you need to delete the old init at info pack, Menu Scheduler-->init options for source system.

After the successful of init, you can cross check at source side RSA7. Once material record was changed that entry will be captured at RSA7.

Thanks

0 Kudos

Hello Korrapati,

This has been done and i believe it is not the case with corrupted delta.

I am still waiting for anyone else to respond.

THanks

Haradev

Former Member
0 Kudos

Hi Haradev,

Can you see the entries of delta in SMQ1?

Regards,

Rambabu