is it possible workforce planning in workcenter level

0 Kudos

Hi,

is it possible workforce planning in workcenter (means assign the employees in workcenter). please sugget about this....

Regards,

Purna

Accepted Solutions (1)

Accepted Solutions (1)

former_member195427
Active Contributor
0 Kudos

Hi

Yes, it is possible.You can assign resources to WC independently and utilize them in your project. You can also validate during person assignment to NWA that only work center  assigned resources must be allowed in workforce planning. At Work center level also you can check resource utilization like overload or under load etc.

Regards

Saurabh

Answers (3)

Answers (3)

sanjeevc
Active Contributor
0 Kudos

Hi Purna,

what you means here for work force planning?

Normally we can consider work center as person, group of person, machine & group of machine as well.

but normally work force planning we use as resource assign to any activity in cmp2 let say person availability is 4 hours for that day and task should be completed in same day but it can be complete in 8 hours so 4 hours is required for next person so we can assign two person on same activity.

CMP9 is the profile for work force planning

test it and let me know?

Regards,

Sanjeev

Former Member
0 Kudos

Yes it is possible to WF planning on WC. Please go thru the link below:

http://help.sap.com/saphelp_470/helpdata/en/4c/22790746e611d189470000e829fbbd/content.htm

former_member238686
Discoverer
0 Kudos

Hi, Purna

It is posible creating a workcenter  for a group of employees which share same level and specific activity (rate). On this case you will have capacity planning available for this resources.

In other hand it is posible to assign work center (same used on your routing) to this group of employees.  Finally indicate the specific employee ussing personnel number (PERNR) field during confirmation

Below the reference:

(https://help.sap.com/saphelp_46c/helpdata/en/b1/c03722439a11d189410000e829fbbd/content.htm)

Do not consider as posible solution to create a workcenter by each person to include it on the routing..  Because It is not practical and due the difficult to maintain this amout of information inside process.

Regards