Can PR be transferred to SRM without PI in V7.x ?

former_member581526
Participant
0 Kudos

HI, experts

     RT,  could we realize the transferring PR from ECC to SRM without PI in SRM version 7.x? , if can, how to do ?

     thanks

     Jesse.

Accepted Solutions (0)

Answers (2)

Answers (2)

Yateesh_h
Active Participant
0 Kudos

Hi Jesse,

PR and PO both can be transferred to the SAP ECC backend through RFC and hence PI is not necessary. It is only if you need SRM to connect to non-SAP systems (& SAP systems like SUS), you require PI.

Please set-up an RFC connection in SM59, job(as mentioned by Robin) and the other settings like n umber ranges, transaction types and back-end document types you should be good to go.

Hope this helps

Cheers,

Yateesh

robin_janke
Contributor
0 Kudos

Sure,

just follow the steps in the config guides. Schedule BBP_EXTREQ_TRANSFER and you are set.

Regards,

Robin

former_member581526
Participant
0 Kudos

Dear Robin

     I want to know clearly BBP_EXTREQ_TRANSFER can be used after LOG_MM_P2PSE_3 actived?

     thanks

    Jesse.