cancel
Showing results for 
Search instead for 
Did you mean: 

Delivery Item Proposal

former_member186940
Participant
0 Kudos

Hello All,

I have a requirement which is described as follows,

"On a pallet 20 finished material can be loaded,  if user wants to deliver 144 quantities, delivery item should be split into two,

     10)       Finished Material                   20* 7           140

     20)       Finished Material                                           4

So that i will be able to use packing instructions separately for standard full pallet size quantity i.e. user be able to create 7 pallets and pack 4 finished goods separately in boxes. Standard Pallet size of material will never change, i.e. 20 materials per pallet."

Deliveries will be created wrt Sales order and Scheduling Agreement (in case of EDI customer).

Request you to please guide me on this. thank you in advance.

Regards,

Amol 

Accepted Solutions (0)

Answers (1)

Answers (1)

Lakshmipathi
Active Contributor
0 Kudos

Add the required logic in USEREXIT_MOVE_FIELD_TO_LIPS in include MV50AFZ1

G. Lakshmipathi

former_member186940
Participant
0 Kudos

Good Evening Sir,

Thank you for your reply. I need to take help from ABAP consultant to check. I will update as soon as i am done with testing.

Regards,

amol