on 07-24-2014 12:36 AM
Hi Middleware gurus,
I have a problem in setting up of CRM middleware setup with ECC . The scenario is ECC is connected to CRM already and data is transferred, so as a result of that for all the objects in CRM the default consumer is CRM. And now due to some requirements , i want to connect this same CRM system to another ECC and so the requirement is to change this already existing default consumer to a new consumer as per the new ECC system.
SO, I ran the report MCRM_SETTINGS to change the consumer but the result says- the object is already a consumer.
So, now the question is - cant i over write the already existing consume to a new consumer...
Regards,
Neni.
Hello Neni,
In case you want to connect 1 CRM to 2 ECC systems, you'd be following a MEP(Multiple Exchange Projects) scenario and not a MCRM setting so MCRM_SETTINGS won't be useful here.
Or do you want to disconnect the first ECC and connect a new ECC to the same CRM?
can you please clarify?
BR,
Rohit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Neni,
Did you ran the report and selected the option "Change all
customizing objects"?, this is the most common requirement.
thanks
Willie
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
5 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.