on 07-24-2014 11:30 AM
I have peculiar problem.I have done GR for quality activated material.The lot is visible in QA32. Then i create the inspection plan & assign them in QA32. After assigning i click on the sample tab & click on calculator icon to calculate the sample,but the sample is not calculated.Then i go to Results recording tab & see the sample there the sample is calculated & showing.Here i am able to record results.I am why the sample is not calculated when the calculator icon is clicked but showing in RR screen?
Could you please provide the screen short of sample calculation and RR?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello,
I think u dnt have correct level of knowledge of quality flow.
First u create inspection plan. QP01
Activate QM view and inspection type - MM02
Do GR either (PP or PO) - inspection lot 01 or 04 type created automatically
Inspection plan assigned automatically
SAmple size calculated automatically
Lot status REL
If lot is in CRTD mode then u can directly assign Plan from QA32 or manually via QA02. in that case u need to click on task list assignmment and press enter. System auto calculate sample.
Secondly, if Ur sampling procrdure and seeting maintained at QM view in MM then again system calculate it auto.
Regards
User | Count |
---|---|
95 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.