cancel
Showing results for 
Search instead for 
Did you mean: 

prepare component from two alternative materials

Former Member
0 Kudos

Dear Sir, 

I want to prepare component from two alternative materials , Is it any provision in SAP for that.

EX :- I want to Prepare Mat. X from Mat. A  or Mat. X from Mat. B.

By two alternative way, I know to create BOM for Mat. X with Usege 1 from A and BOM for Mat. X with Usege 2 from B But how it works?

How MRP will run if Finish Comp. of Y is to be prepared from Mat. X . , So what will be the output .

Thanks & regards,

Ashit

Header 1Header 2Header 3

Material " Y " ( finish Product )

Material " Y " ( finish Product )
Material " X " ( semifinish Product )

OR

Material " X " ( semifinish Product )

Material " A " ( raw material )

Material

Accepted Solutions (0)

Answers (3)

Answers (3)

UmeshMali4994
Active Contributor
0 Kudos

Hello Patel,

For your requirement create two BOM

1. BOM -1

      Usage 1,

Alternative 1,

Material X (HLAB)

Material A (ROH)

2.  BOM -2

     Usage 1,

Alternative 2,

Material X (HLAB)

Material B (ROH)

For finished product maintain the BOM

Usage 1

Alternative 1

Material X(HALB)

For finish material “Y”, maintains the production version in MRP4 View or C223

Create two production versions with alternative BOM (1 or 2) and Routing

  1. You can use this production version manually or automatically. As per requirement you choose the production version and again depend on material avlb.

After run MRP system create planned order with respect the production version

Please get back to us in case of any issue

I hope this information helpful to you

Regards

Umesh Mali

Former Member
0 Kudos

Sir I dont know that wich field i have to maintain in C223 .

Please help me out. and My finish component is not inhouse menufacturing but sub contracting.

Thanks

Ashit

Caetano
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hi Ashit

The procedure is very simple and you can learn by yourself if you try.

You can also search for "how to create a production version" on old threads or even on google.

You will find, for example, the thread and documentation below:

Production Version - Repetitive Manufacturing (PP-REM) - SAP Library

Please do some research and try by yourself before asking question on the thread.

BR

Caetano

Former Member
0 Kudos

dear Caerano,

I want to subcontracting component from two alternative materials , Is it any provision in SAP for that.

EX :- I want to Prepare subcontracting PO of  Mat. X

By two alternative way, I know to create BOM for Mat. X with Usege 1 from A and BOM for Mat. X with Usege 2 from B But how it works?

How MRP will run if Finish Comp.( also Subcontracting Comp.) of Y is to be prepared from Mat. X . , So what will be the output .

Thanks & regards,

Ashit

Header 1Header 2Header 3

Material " Y " ( finish Product (Outside sourcing ( subcontracting comp.)))

Material " Y " ( finish Product )
Material " X " ( semifinish Product )( Subcontacting F/30 ) Comp.

OR

Material " X " ( semifinish Product )

Material " A " ( raw material )

former_member214736
Participant
0 Kudos

Hi Ashit,

It seems you want some thing like the buyers to decide what component (X/Y) they want in the final production.

This can be achieved with variant configuration.

I suggest you google for "variant configuration" as this is a vast topic and cant be explained in just one reply.

Thanks and regards,

Suraj Kamble

Former Member
0 Kudos

Hi,

Pl create the two alterater BOM's with different components and create the two production versions and attach these BOMs production versions. Arrange the quota % for the productions versions. Basend on this quota percentage system will generate the MRP.

Regards,

Sivaprasad Ch

Former Member
0 Kudos

Dear Sir,

By which code I have to create Production versions & how we will arrance %. for the productions versions.

Thanks,

Ashit

Caetano
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hello Ashit

Production versions are created on transaction C223.

You can distribute the percentage using a quota arrangement. See the following note for more details:

http://service.sap.com/sap/support/notes/1508647

Another possibility is, instead of creating two different BOMs, to create only one BOM with alternative items. Check the following link for more details:

Alternative Items in an Alternative Item Group - BOMs (PP-BD-BOM) - SAP Library

BR

Caetano

Former Member
0 Kudos
Former Member
0 Kudos

Dear Sir,

I cant Understud please explain me with Transection code.

I want to create Material " A " with raw material " X " or " Y ". Ites depends on availablity in Market Which one is readily available.

I want to pass on such information to Buyer that they can see that they have to purchase material " X " or " Y " .

Thanks,

Ashit