Split Transfer Requirment / Transfer Order: Need 1 TO with many lines

Former Member
0 Kudos

I am running the following scenario for replenishment (mvt 320)

1) LP21 Create TR

2) LB10 convert TR to create TO

My issue is that I want to create only 1 TO with 1 line per source bin. However, it creates 1 TO per material.

It currently creates 1 TR per material and 1 TO per material

My configuration is the following:

1) Profile for Transfer Order Splitting

Profile:              2

Sort Profile:       2

2) Sort profile for TO splitting

1st Sort: VLTYP (source storage type)

2nd Sort: VLPLA (source storage bin)

3nd Sort: MATNR (material)

3) Performance Data Control

Mvt: 320

Source and Dest: ***

Profile Perf. data: blank

Profile TO Split: 2

What am I missing to create only 1 TO with one line per bin?

Thanks!

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

I modified the sort taking out the MATNR and it still creates 1 TO per material.

The strange thing is that the same sort now works well when I create a good issue.

It creates 1 transfer requirtement instead of two.

Could my issue be related to LP21 not creating 1 TR only?

JL23
Active Contributor
0 Kudos

I would say you must not have the MATNR in your sort profile if you want several different materials in the same TO.