on 07-25-2014 10:24 AM
Hi QM experts,
First, I have some problem about QM control chart.
Second, I'm trying to use QM to control hazardous material.
Many thanks
Ming
Hello,
There is an option where u can insert from date and to date. whenyou insert dates thensystem give you all the lots. Secondly, what option you have choosed in inspection plan against MIC in SPC criteria is also important i.e SPC for Material/Task list /inspection lot or characteristics ? so choose correct one and re execute for exact results.
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
So is there any possible that graphic can display multiple inspection lot in the same time?
If the answer is yes, could you please tell me how to setting corresponding parameter and also show me the graphic.
The graphic as my thought is like the following picture, I'm not sure it's correct or wrong...
Hello,
Seondly, i saw that all ur inspection lot has status 1, u need to close above one and try to take chart at 13th position. always keep in mind that if you executing control chart then u need to close the previous one i.e. status 5. If chart is in 1 status then system will not show you the trend of all inspection lots and related mic trend value. first it will 1= new, 3 = active and 5= completed.
before 13, select all and change status from 1 to 3 and from 3 to 5.
regards
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.