cancel
Showing results for 
Search instead for 
Did you mean: 

How to allocate scrap cost to materials

michael_savarimuthu
Contributor
0 Kudos

Hello Experts,

Is it possible to allocate cost of scrap of a material to materials that consume this material?

I am looking for a mechanism like CKMDUVMAT.

Cheers,

TD

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hello TD,

Remove the scrap material from the Bill of material. So, whatever issued to production order will be consumed and will be costed accordingly.

regards,

makrand