Hi,
One of our clients has the following requirement -
MRP will be done based on MOQ (Minimum Order Quantity) i.e. SAP will consider, while MRP, that if an item is repeated 20 times, with qty sum = 43 nos, and its MOQ is 10 nos, then PRN (Purchase Requisition Note) 50 nos will be released. |
The client is using SAP 2007 SP01 PL09 and he is ready to upgrade the SAP version to the latest.
I believe that this can be possible, so please let me know, in which version of SAP, is this possible ?
Hi,
Please refer SAP note for solution:
862814
- MRP and lead time requirements
Thanks & Regards,
Nagarajan